In 2006 when Amanda Boland finally became totally exasperated by her cramped kitchen extension and even more confined bathroom, she turned to Building Concepts for help.

Plans of the existing & proposed extension

 

The Project Consultant suggested knocking down the existing extension and building a larger extension which would be able to accomodate a good size kitchen and bathroom.  By careful planning, he was able to incorporate a second w.c. as well as an utility room and managed the entire planning process. Before  signing the contract Amanda was able to review other projects that he had completed, as well as to meet other satisfied customers, one of whom actually had a project in progress.

 

 

Given the choice of building in the late autumn or waiting for the spring, Amanda decided to "go for it" as she had set her heart on having her new kitchen and bathroom in time for Christmas.

 

Work started during the first week in November and, before the end of the week potential disaster struck when the excavations revealed that the land was unsuitable for traditional foundations.

 

As Amanda recalls: "the Building Inspector insisted on a raft foundation, essentially a huge single slab covering the entire area of the proposed extension and going well beyond the depth of the specified foundations. I could have cried when I heard this, as I had no washing or cooking facilities and was having to use an outside temporary toilet. However, Kevin and the boys did a magnificent job in turning round the complex calculations required for the new foundation, over the weekend."

 

Matters became even more serious when constant and torrential rains through the rest of November further hampered progress. In response, the building team geared up to 7 day working, and scheduled more team members.

 

Having gradually won back most of the lost time, Amanda was due to be given possession two days before Christmas. However, this still left her with the immense task of fitting the new kitchen (which had been excluded from the original contract). Again the Building Concepts team stepped up to the plate.

 

As Amanda explained "Without even being asked, Kevin and the boys stepped in and fitted the entire kitchen for me in the space of a day. After all the delays and the major change to the specification, I still had my new kitchen and bathroom in time for Christmas. Yes, of course the costs were higher than originally budgeted but were still within my original contingency figure. All in all a wonderful job which I don't think another company would have achieved."

 

Free Survey & Consultation

Please click the button to book your free and no obligation survey and evaluation visit:

 

Request a free consultation

Latest News

The Benefits of Project Management

12/10/2011
project manager role.png
If you ever needed convincing about the advantages of engaging a Project Manager for your building work, then consider the benefits that a professional project management team can bring to your project.   Our set-up service provides you with a…

Logpods - The Future of Camping

10/10/2011
logpod.png
If you run a camp site or caravan park, then you must be familiar with the term "glamping" and the current hype surrounding the move towards "luxury" camping.To meet this demand, The Log Pod offers a great way to introduce camping-in-style to your…

Booking Systems for Hotels

24/04/2011
booking engine inclusions.jpg
Today, hotel owners and accommodation providers of all types and sizes face increased competition for bookings and, as online booking becomes ever-more important, it is vital that they are able to extend their on-line presence to capture their fair…

Building Insurance Claims - who repairs your property?

04/02/2011
dsc02995.jpg
When you make a claim against your home insurance policy, a question that many people don’t even consider is “who will be doing the work to repair my property?”   Traditionally, when making a claim, the home-owner has been asked to supply…

Dedicated service for Dentists

30/07/2010
FS Building Concepts provides a range of building services dedicated to dentists.   In light of the implementation of the HTM01-05 regulations governing decontamination processes in dental practices, many dentists are faced with disruptive…

Search

Swansea Building Extensions

Copyright © 2013 Property Extensions Swansea Building Concepts. | Llanelli Web Design by Paragon Web Design